Manufacturing approval worksheet and handoff checklist
Fictional example — inspection worksheet evaluation
A reusable request form, approval matrix, and eight review checks for one bounded manufacturing decision.
Adapt this worksheet to your organization’s procedures, approval authority, and records. The worked example uses fictional information and authorizes document-based evaluation only.
How to use this worksheet
- This fully filled example shows the worksheet at the moment an evaluation task is accepted. The evaluation itself has not finished.
- Every identifier, role holder, document, date, and result is fictional. Replace all sample values; do not adopt the example authority or timing as your own rules.
- The example authorizes desk evaluation only. A later implementation decision needs its own scope, evidence, and authorized review.
1. Request and decision record
- Request ID
Use a unique ID and link to any related or replaced request.
REQ-DEMO-001. All identifiers, people, documents, dates, and decisions below are fictional.- Version and date
Record the version, last update, and time zone so reviewers use the same packet.
Version 03; updated 03 Sep 2026, 09:00 ICT (UTC+7). Versions 01 and 02 retained in the fictional request folder.- Trigger and reason
Name the event that opened this request and why a decision is needed.
Two internal practice reviews found inconsistent wording in an inspection worksheet. The team requests a desk evaluation of a clearer draft.- Affected area, equipment, or product
Use identifiers and state the boundaries of this request.
Fictional Factory A; inspection worksheet FORM-DEMO-07; training product SAMPLE-DEMO-A only.- Exact decision requested
State the permitted next action if approved. Separate evaluation from execution.
Authorize a desk evaluation of worksheet draft 02 against five fictional historical sample records, then submit findings for a separate review.- Outside this approval
List actions this decision does not authorize.
No change to live production, inspection criteria, controlled instructions, product release, or purchasing is authorized.- Request owner
Name the person or role responsible until the next owner accepts the handoff.
Requester A, quality coordinator (fictional role holder); owns the request until Engineer B accepts the evaluation task.- Current instructions and baseline
Reference the current instruction version and the facts used for comparison.
WI-DEMO-04 version 01 and FORM-DEMO-07 version 01. These fictional references remain the baseline; the draft does not replace them.- Proposed action
Describe the steps and any limits, timing, or resources.
Engineer B compares current and draft wording against SAMPLE-DEMO-01–05, logs ambiguities and differences, and returns an evaluation note by 04 Sep 2026, 16:00 ICT.- Evidence and access
For each item, record ID, title, version, approved storage location, and who can open it.
EV-DEMO-01: current worksheet v01; EV-DEMO-02: proposed worksheet draft v02; EV-DEMO-03: five synthetic sample records v01; EV-DEMO-04: evaluation plan v02. Fictional location: Request folder / REQ-DEMO-001 / v03. Engineer B and Reviewer C confirmed access at 09:15 ICT.- Open questions and dependencies
For each gap, name an owner, due time, and whether it prevents the requested decision.
Question Q-DEMO-01: can each sample be interpreted consistently using the draft? Engineer B owns the answer, due with the evaluation note. This question is the purpose of evaluation and does not block its authorization; it must be resolved before any later implementation decision.- Risks, limits, and stop conditions
Record issues needing human review and what changes require stopping or another review.
Use synthetic records only. Stop and return to Reviewer C if the work would require live production data, altered inspection criteria, or a wider scope. Requester A will update the version and obtain a fresh decision before that work proceeds.- Reviewers, authority, and backup
Identify each decision owner, authority reference, and permitted deputy; use the matrix below.
Reviewer C, quality manager, may authorize desk evaluations under fictional authority matrix AUTH-DEMO-01. Deputy D may act only when delegation is recorded. No delegation used in this example.- Due time and escalation
Set a time zone, reminder owner, escalation trigger, and recipient. Silence is not approval.
Decision requested by 03 Sep 2026, 12:00 ICT. Requester A follows up at that time if unanswered and escalates to the operations lead after one working day. Unanswered requests stay pending.- Decision and rationale
Record decision, reviewer, timestamp, reviewed version, reasons, conditions, and decision reference.
DEC-DEMO-01: approved for desk evaluation only by Reviewer C on 03 Sep 2026, 10:00 ICT, using request v03 and EV-DEMO-01–04. Reason: the evidence and bounded plan are sufficient for evaluation. All exclusions and stop conditions remain in force.- Next action and accepted handoff
Name the receiving owner, required action, due time, acceptance time, and closure evidence.
Engineer B accepted at 10:10 ICT on 03 Sep 2026; evaluation note EVAL-DEMO-01 due 04 Sep 2026, 16:00 ICT. Requester A recorded the handoff. Reviewer C will review the note before this evaluation task can close. Evaluation remains open; no implementation is authorized.
2. Approval responsibilities
Approval stage 1
- Stage
- 1. Packet readiness
- Decision and permitted action
- Return gaps or confirm the packet is ready for review; this is not approval to evaluate.
- Decision owner / deputy
- Requester A prepares; Engineer B checks technical completeness. Backup: Engineer E if assigned by the team lead.
- Required evidence
- EV-DEMO-01–04 and request v03.
- Target time
- 03 Sep 2026, 09:30 ICT.
- Return or escalation route
- Return missing items to Requester A; record the question and due time.
- Decision record
- Ready for review at 09:30 ICT; prior missing attachment resolved.
- Receiving owner and acceptance
- Reviewer C accepted the review packet at 09:30 ICT.
Approval stage 2
- Stage
- 2. Evaluation authorization
- Decision and permitted action
- Authorize desk evaluation only, or return/reject the proposal.
- Decision owner / deputy
- Reviewer C under AUTH-DEMO-01; Deputy D only with recorded delegation.
- Required evidence
- Request v03, evidence register, open questions, and stop conditions.
- Target time
- 03 Sep 2026, 12:00 ICT.
- Return or escalation route
- Requester A follows up when due; escalate to operations lead after one working day. Keep pending until an authorized decision.
- Decision record
- DEC-DEMO-01, 10:00 ICT: approved for evaluation only; exclusions unchanged.
- Receiving owner and acceptance
- Engineer B accepted at 10:10 ICT; EVAL-DEMO-01 due 04 Sep, 16:00 ICT.
Approval stage 3
- Stage
- 3. Evaluation closure — planned
- Decision and permitted action
- Review findings and close or return the evaluation task. Production implementation remains outside this request.
- Decision owner / deputy
- Reviewer C; Deputy D only with recorded delegation.
- Required evidence
- EVAL-DEMO-01 and the response to Q-DEMO-01; not yet available.
- Target time
- Review target: one working day after receipt of the completed evaluation note.
- Return or escalation route
- Return unresolved findings to Engineer B with a new due time; changed scope needs a new decision.
- Decision record
- Pending — evaluation is open. No closure decision recorded.
- Receiving owner and acceptance
- Engineer B owns the evaluation; Reviewer C will accept the findings when submitted.
3. Review and handoff checks
Decision scope and limits are explicit
Point to the requested decision and excluded actions.
- Status
Ready / Needs action / Not applicable — state why
Ready- Evidence, action, or reason
- Request v03 explicitly permits desk evaluation only; live execution is excluded.
- Checked by
- Reviewer C (fictional)
- Date and time
- 2026-09-03 10:15 ICT (UTC+7)
Evidence is current and accessible
List evidence IDs, versions, and who tested access; record any gap.
- Status
Ready / Needs action / Not applicable — state why
Ready- Evidence, action, or reason
- EV-DEMO-01–04 listed with versions; Engineer B and Reviewer C confirmed access at 09:15 ICT.
- Checked by
- Reviewer C (fictional)
- Date and time
- 2026-09-03 10:15 ICT (UTC+7)
A person checked the packet against its sources
Record the checker and time. Identify and correct any AI-generated draft before submission.
- Status
Ready / Needs action / Not applicable — state why
Ready- Evidence, action, or reason
- Requester A compared v03 with EV-DEMO-01–04 at 09:00 ICT; Reviewer C checked the packet at 09:30 ICT. No AI draft used.
- Checked by
- Reviewer C (fictional)
- Date and time
- 2026-09-03 10:15 ICT (UTC+7)
Reviewers and deputies have the required authority
Reference the applicable authority rule and any recorded delegation.
- Status
Ready / Needs action / Not applicable — state why
Ready- Evidence, action, or reason
- AUTH-DEMO-01 identifies Reviewer C for this limited decision. No deputy acted.
- Checked by
- Reviewer C (fictional)
- Date and time
- 2026-09-03 10:15 ICT (UTC+7)
Missing information and overdue work have an owner
Record the return question, owner, due time, and escalation recipient; do not treat silence as consent.
- Status
Ready / Needs action / Not applicable — state why
Ready- Evidence, action, or reason
- The missing evaluation-plan attachment in v01 was returned to Requester A on 02 Sep and supplied in v02. Q-DEMO-01 has an owner and due date; overdue decisions escalate under the recorded rule.
- Checked by
- Reviewer C (fictional)
- Date and time
- 2026-09-03 10:15 ICT (UTC+7)
The decision can be traced to the reviewed version
Record the result, reasons, reviewer, time, version, and limits.
- Status
Ready / Needs action / Not applicable — state why
Ready- Evidence, action, or reason
- DEC-DEMO-01 records Reviewer C, 03 Sep 2026 10:00 ICT, v03, rationale, and the desk-evaluation limit.
- Checked by
- Reviewer C (fictional)
- Date and time
- 2026-09-03 10:15 ICT (UTC+7)
The receiving owner has accepted the next action
Record the named recipient, acceptance time, due time, and required completion evidence.
- Status
Ready / Needs action / Not applicable — state why
Ready- Evidence, action, or reason
- Engineer B accepted at 10:10 ICT; the due date and EVAL-DEMO-01 completion evidence are recorded. The evaluation itself is still open.
- Checked by
- Reviewer C (fictional)
- Date and time
- 2026-09-03 10:15 ICT (UTC+7)
Changes and closure follow a defined review path
Name who can reopen, cancel, or replace the request and what changes require another decision.
- Status
Ready / Needs action / Not applicable — state why
Ready- Evidence, action, or reason
- Requester A owns version updates. Reviewer C may close, return, or reopen the evaluation request; cancellation is recorded by Reviewer C. A wider scope requires a revised packet and a new decision.
- Checked by
- Reviewer C (fictional)
- Date and time
- 2026-09-03 10:15 ICT (UTC+7)